- Assembly Drawings
- Bidding/Estimating
- Building Code Compliance
- Building/Equipment Inspection
- Computer Aided Drafting
- AutoCAD R13
- Paper Space, Model Space, XRefs
- Layering Standards
- Script Files with Slide Shows
- Menu Programming
- Autolisp Programs
- Construction Management
- Contract Administration
- Contract Enforcement/Compliance
- Contract Management/Negotiation
- Coordination with Permit Officials
- Cost Distribution/Estimating
- Departmental Coordination
- Design Methodologies
- Design Team Coordination
- Document Control
- Drawing Layout
- Contractor Specification
- Engineering/Drafting Fields:
- Architectural Design
- Civil Engineering
- Electrical/Electronics Design
- Engineering Systems
- HVAC Design
- Industrial Design
- Landscape Design
- Plumbing Design
- Structural Design
- Floor Plans, Elevations
- Site Plans, Sections, Details
- Plot Plans, Foundations
- Framing Plans, Load Forces
- Heat/Loss Gain Calculations
- Fluid Dynamics
- Structural, Piping, Civil Drafting
- Traverses / Civil Profiles
- Contour Maps, Highway Layout
- Device Symbols, Block Diagrams
- Printed Circuit Board Layout
- Wiring/Ladder Control Diagrams
- Logic Diagrams
- Machining, Forming Processes
- Weldments, Threads, Fasteners
- Mechanical Principles
- Engineering/Design Support
- Facilities Management
- Job Costing/Budgeting
- On-Site Inspection
- Preliminary Drawings
- Project Coordination
- Project Execution
- Liaison to Architects/Builders
- Project Management __Project Scheduling
- Proposal Development
- Trades Management
- Take-Offs/Specifications
- Team Coordination
- Technical Documentation
- Technical Staff Supervision3-D Drawings
- Workload Prioritization
- Work Order Changes
------------------------------------------------------------------------------------------
Contoh pemakaian dalam kalimat
- Conducted on-site inspections for ___ projects.
- Created preliminary drawings for ___ projects.
- Coordinated ___ and ___ project requirements.
- Managed all phases of project scheduling and execution.
- Planned and controlled projects with total fees of Rp.___.
- Developed and submitted over ___ proposals.
- Specified and supervised up to ___ trades contractors.
- Prepared take-offs and specifications for ___ projects.
- Coordinated design requirements with team of ___.
- Prepared technical documentation for work order changes.
- Supervised ___ staff which included ___, ___, ___.
- Prepared 3-D drawings utilizing AutoCAD R13.
- Prioritized workload to support ___ engineers.
- Managed work order changes for ___ staff.
- Drafted details for ___, ___, ___ and ___ systems.
- Updated and corrected plans submitted by architects.
- Revised up to ___ plans daily during peak periods.
- Drafted, plotted & inventoried attributes for ___ projects.
- Prepared site development plans including ___ and ___.
- Performed loading, stress and heat loss calculations
- Conducted on-site inspections for ___ projects.
- Created preliminary drawings for ___ projects.
- Coordinated ___ and ___ project requirements.
- Managed all phases of project scheduling and execution.
- Planned and controlled projects with total fees of $___.
- Developed and submitted over ___ proposals.
- Specified and supervised up to ___ trades contractors.
- Prepared take-offs and specifications for ___ projects.
- Coordinated design requirements with team of ___.
- Prepared technical documentation for work order changes.
- Supervised ___ staff which included ___, ___, ___.
- Prepared 3-D drawings utilizing AutoCAD R13.
- Prioritized workload to support ___ engineers.
- Managed work order changes for ___ staff.
- Drafted details for ___, ___, ___ and ___ systems.
- Updated and corrected plans submitted by architects.
- Revised up to ___ plans daily during peak periods.
- Drafted, plotted & inventoried attributes for ___ projects.
- Prepared site development plans including ___ and ___.
- Performed loading, stress and heat loss calculations
0 komentar:
Posting Komentar